Aphrodite surface water assessment

Aphrodite surface water assessment

24 Aug 2017

Bardoc Gold is developing the Aphrodite Gold Project , a proposed gold mine in the Eastern Goldfields region of Western Australia. The site is located 65 km north of Kalgoorlie. The Western Australia goldfields are one of Australia’s main gold producing regions.

Gold mineralisation was first discovered in the area in 1996. The project was acquired by Aphrodite Gold from Apex Minerals NL in 2009. The project was classified as a resource in 2011 and scoping studies undertaken in 2012/2013. Aphorodite Gold merged with Bardoc Gold in 2018.

Mining will be undertaken initially as an open cut pit followed possibly by underground mining. Active mining of the open pit is projected to be up to 3 years. Underground mining extends the mine life by another 3.5 years.

The project is undertaking prefeasibility and environmental impact assessment studies as part of development of the mine. These will lead into feasibility studies.